GSB 7.1 Standardlösung

Navigation und Service

Seiteninhalt

Initial assessment

No type-approval can be granted without an initial assessment.

All necessary information is given in "Information sheet on Initial Assessment (MAB)".

Information sheet on Initial Assessment - Version: April 2016FileTypevnd.openxmlformats-officedocument.wordprocessingml.document, 473KB, Datei ist nicht barrierefrei

In the initial assessment, the Kraftfahrt-Bundesamt (KBA) checks if it is to be expected that the procedures taken by the manufacturer will lead to a type-approval conform production.

  • An on-site inspection is required for this. The "Report on CoP (Form)" document describes what is checked during the inspection.

    Report on CoP (Form) - Version: August 2017rtf, 2MB, Datei ist nicht barrierefrei

  • Such an inspection is not necessary when a suitable certification according to EN ISO 9001 or equivalent standard is presented. In this case it is also necessary to create a “CoP information” document.
  • If another European type-approval authority confirms a successful initial assessment, an inspection is also net necessary.

The decision on which designated technical service is to draw up the technical report and who should carry out the on-site inspection should be taken at an early stage.

Designated technical services (product testing) - Version: 22 December 2021PDF, 641KB, Datei ist nicht barrierefrei

In addition, the manufacturer must prove his or her legal identity.

Hinweis zur Verwendung von Cookies

Cookies erleichtern die Bereitstellung unserer Dienste. Das KBA verwendet auf seiner Internetseite ausschließlich technisch notwendige Cookies. Mit der Nutzung unserer Dienste erklären Sie sich mit der Nutzung dieser Cookies einverstanden. Detaillierte Informationen zum Datenschutz erhalten Sie über den folgenden Link: Datenschutz

OK