GSB 7.1 Standardlösung

Navigation and service

Seiteninhalt

Initial assessment

No type approval can be granted without initial assessment. All necessary information on initial assessment is contained in the "Merkblatt zur Anfangsbewertung" (MAB).

With the initial assessment, the KBA checks whether the procedures installed by the manufacturer can be expected to produce in conformity with the approval.

  • This requires an on-site inspection. What is checked during the on-site inspection is described in the document "Report on CoP".
  • Alternatively, a suitable certificate according to EN ISO 9001 or equivalent standard can be presented. In these cases, a "Report on CoP" must also be prepared.
  • Or another EU-type-approval authority confirms a successful initial assessment.

A decision should be taken at an early stage as to which "designated technical service" is to draw up the test report and who is to carry out the one-site inspection.

In addition, the manufacturer must prove his legal identity.